Bunker Hill Mine Safeguard Project

The Bunker Hill Mine Safeguard Project is located approximately 3.5 miles southwest of the town of Red River in Taos County, New Mexico. The project area (Figure 2) is on the Red River, New Mexico, USGS 7.5’ quadrangle map within the Questa Ranger District of the Carson National Forest.

This project involves the following work:

  • Construction of a polyurethane foam plug at one shaft:
  • Excavating drainage channels along two sides of the cabin;
  • Constructing waterbars at locations designated by the U.S. Forest Service.

Note the time restrictions for closure of some of the mine features as detailed in Table II of Division 2.

Demobilization shall be conducted in such a manner to ensure that the Contractor leaves all project areas in as good or better condition than before disturbance.

 
Specifications, maps and figures are provided below.
Bunker Hill Mine Safeguard Project Specifications
Figures and maps
Figure #1 Figure #3 Figure #5
Figure #2 Figure #4 Figure #6
     

Images of the Project (pending)

 

NON-MANDATORY PRE-BID CONFERENCE
DATE: Wednesday, June 30, 2010
Location: Parking lot of Carson National Forest Service
Questa Ranger District Office, Hwy. 38
A approximately one mile east of Quest.

PRE-BID ATTENDANCE LIST & AGENDA

Sealed bid opening:
NM STATE PURCHASING DIVISION
ITB No. 00-521-00-05218
DATE: Friday, July 9, 2010 @ 2:00PM

Low Bidder's List

   

BID DOCUMENT - Please follow instructions below:
1. Please READ all information in project manual before submitting a bid.
2. Upon entering all your data into form do a "SAVE AS" and save into your computer if you wish to save document.
3. To print click on the FILE tab then arrow down to PRINT.
4. Sign form and mail to:
General Services Department
Purchasing Division
P.O. Box 6850
Santa Fe, NM 87502
(505) 827-0472

 

NOTE: Administrative questions and/or comments contact:Dina Vigil @ 505.476.3430 or e-mail
Technical questions and/or comments contact:Mike Tompson @ 505.476.3427 or e-mail

 
Post-construction Information
Year Completed:
Cost: $

Project Engineer: Mike Tompson, P.E.
Project Manager: Lloyd Moiola

 

New Mexico Energy, Minerals and Natural Resources Department | Copyright
1220 South St. Francis Drive | Santa Fe, NM 87505
Webmaster   |   EMNRD Legal Disclaimer