EMNRD-MMD-2013-0x
San Pedro Mine Safeguard Project
-Coming soon-
Awarded Amount:
Final Cost:
EMNRD-MMD-2013-04
Oscura Mine Maintenance Project
Johnson Environmental
Awarded Amount: $6,991.00
Final Cost:
EMNRD-MMD-2013-03
Orogrande Mine District Maintenance Project
Runyan Construction, Inc.
Awarded Amount: $4,255.00
Final Cost:
EMNRD-MMD-2013-02
Cleveland Mine Safeguard Project
Runyan Construction, Inc.
Awarded Amount: $384,266.02
Final Cost:
EMNRD-MMD-2013-01
Sugarite Gob Reclamation Project Phase VIII/Yankee-Vukonich Maintenance II
Previous bid results were cancelled
Bid Opening Date: May 31, 2013 at 2:00 p.m.
Apparent Low Bidder: 814 Solutions LLC
Apparent Lowest Bid: $429,297.08
2012 Go back to the top
EMNRD-MMD-2012-04H (Hybrid)
Madrid Low Impact Stormwater Project
Rangeland Hands, Inc.
Awarded Amount: $500,000.00
Final Cost:
EMNRD-MMD-2012-02
Gage Mine Maintenance Project
Silver Gryphon Southwest, LLC
Awarded Amount: $2,598.60
Final Cost: $2,598.60
EMNRD-MMD-2012-01
Bradley Group Mine Safequard Project– Phase I
Duran Bokich Enterprises, LLC
Awarded Amount: $475,093.31
Final Cost:
2011 Go back to the top
EMNRD–MMD–2011-08
Lake Valley Phase I, II, IV Maintenance Project
Runyan Construction, Inc.
Awarded Amount:11,945.00
Final Cost:$11,945.00
EMNRD-MMD-2011-07
Bunker Hill Mine Safeguard Project - Phase II
Max Maintenance and Construction, LLC
Awarded Amount:$16,800.00
Final Cost: $19,999.00
EMNRD-MMD-2011-06
Madrid - Maintenance Project 2011
Runyan Construction, Inc.
Awarded Amount: $4,435.60
Final Cost: $2443.85
EMNRD-MMD-2011-05
VPR - Swastika Mine and Dutchman Canyon Reclamation Project
Kiewit New Mexico Co.
Awarded Amount: $4,135,587.88
Final Cost:
EMNRD-MMD-2011-04
Cerrillos Gravel Pit Shaft Safeguard Project
Apparent Low Bidder: Runyan Construction
Awarded Amount: $13,067.00
Final Cost: $13,067.00
EMNRD-MMD-2011-03
Rogersville Mine Safeguard Project - Phase II
Sunset Distributing
Awarded Amount:$9,980.10
Final Cost:$9,980.10
EMNRD-MMD-2011-02
Rogersville Mine Safeguard Project - Phase I
Runyan Construction, Inc.
Awarded Amount: $7,777.00
Final Cost: $7,777.00
EMNRD-MMD-2011-01
Harding Pegmatite Mine Safeguard Project
Runyan Construction, Inc.
Awarded Amount:$184,769.20
Final Cost: $206,698.45
2010 Go back to the top
EMNRD-MMD-2010-10
Bayard West Maintenance 2010
Runyan Construction, Inc.
Awarded Amount: $22,978.00
Final Cost:$22,978.00
EMNRD-MMD-2010-09
Real de Dolores Maintenance Project
Buena Vista Masonry, Inc.
Awarded Amount: $10,854.43
Final Cost:$10,854.43
EMNRD-MMD-2010-08
Cerrillos Central/Bonanza Creek Mine Safeguard Project - Phase I
St. Cloud Mining Company
Awarded Amount: $132,067.86
Final Cost:$151,518.86
EMNRD-MMD-2010-07
Jones Mine Safeguard Project
KW Enterprises, LLC
Awarded Amount: $8,500.00
Final Cost:$8,500.00
EMNRD-MMD-2010-06
Bunker Hill Mine Safeguard Project
Johnson Environmental
Awarded Amount:$37,633.01
Final Cost:$35,443.38
EMNRD-MMD-2010-05
Organ Phase II Maintenance
Silver Gryphon Southwest, LLC
Awarded Amount: $4,520.94
Final Cost:$4,520.94
EMNRD-MMD-2010-04
Socorro West Maintenance Project - Phase II
St. Cloud Mining Company
Low Bid Amount: $88,608.00
Final Cost:$99,969.94
EMNRD-MMD-2010-03
Queen of the Guadalupes Mine Safeguard Project
Runyan Construction, Inc.
Awarded Amount: $62,860.97
Final Cost:$80,838.47
EMNRD-MMD-2010-02
Lake Valley Mine Safeguard Project - Phase IV
Pioneer Industries, Inc.
Awarded Amount:$389,465.21
Final Cost:$433,840.05
EMNRD-MMD-2010-01
Sugarite Gob Reclamation Project - Phase VII
Samcon, Inc.
Awarded Amount: $738,044.13
Final Cost:$795,934.31
2009 Go back to the top
EMNRD-MMD-2009-09
Cerrillos-Real de Cerrillos Maintenance Project
Sunset Distributing
Awarded Amount: $9,159.00
Final Cost: $9,159.00
EMNRD-MMD-2009-08
San Pedro Small Construction Project
Max Maintenance and Construction
Awarded Amount: $2,675.00
Final Cost: $2,675.00
EMNRD-MMD-2009-07
Lordsburg/Fluorite Ridge Emergency Maintenance Project
Runyan Construction
Awarded Amount: $7,527.71
Final Cost: $15,186.71
EMNRD-MMD-2009-06
Lake Valley Mine Safeguard Project - Phase IV
(Moved to EMNRD-MMD-2010-02)
EMNRD-MMD-2009-05
Socorro West Maintenance II
(Moved to EMNRD-MMD-2010-04)
EMNRD-MMD-2009-04
Madrid Maintenance Project
Max Maintenance and Construction
Awarded Amount: $4,893.25
Final Cost: $4,893.25
EMNRD-MMD-2009-03
Carthage Imprint Seeding Project
Runyan Construction
Awarded Amount: $51,990.90
Final Cost: $54,936.50
EMNRD-MMD-2009-02
Carbonate Hill Mine Safeguard Project
Pioneer Industries, Inc.
Awarded Amount: $225,646.88
Final Cost: $225,346.01
EMNRD-MMD-2009-01
Yankee-Vukonich Maintenance Project
St. Cloud Mining Company
Awarded Amount: $52,199.56
Final Cost: $51,160.53
2008 Go back to the top
EMNRD-MMD-2008-06
Cerrillos South Emergency Maintenance Project
Essential Utilities of Santa Fe, NM
Awarded Amount: $7,197.19
Final Cost: $7,197.19
EMNRD-MMD-2008-05
Gallup Southwestern Coal Mine Safeguard Project
Project Cancelled
EMNRD-MMD-2008-04
La Ventana Mine Maintenance Project
Small Construction
Johnson Environmental of Alamogordo, NM
Awarded Amount: $3,930.10
Final Cost: $3,930.10
EMNRD-MMD-2008-03
Lake Valley Mine Safeguard Project - Phase III
Runyan Construction of Silver City, NM
Awarded Amount: $98,194.53
Final Cost: $99,329.12
EMNRD-MMD-2008-02
Project Cancelled -
All bids rejected.
EMNRD-MMD-2008-01
Sugarite Gob Reclamation Project - Phase VI
Samcon, Inc. of Albuquerque, NM
Awarded Amount: $824,965.05
Final Cost:$861,745.61
2007 Go back to the top
EMNRD-MMD-2007-03
Orogrande Mine Safeguard Project - Phase II
Pioneer Industries, Inc., Albuquerque, NM
Awarded Amount: $614,717.72
Final Cost: $685,317.20
EMNRD-MMD-2007-02
La Ventana Mine Safeguard Project - Phase II
E & E Construction, La Madera, NM
Awarded Amount: $6,625.00
Final Cost: $7,140.60
EMNRD-MMD-2007-01
Lake Valley Mine Safeguard Project - Phase II
St. Cloud Mining Company, Truth or Consequences, NM
Awarded Amount: $662,263.55
Final Cost: $711,182.35
EMNRD-MMD-2007
Gallup-Heaton Backfilling 2007
2006 Go back to the top
EMNRD-MMD-2006-05(M)
Lordsburg Mine Maintenance Project
Runyan Construction Co., Silver City, NM
Final Cost: $10,346.11
EMNRD-MMD-2006-04
Madrid North Mine Safeguard Project
E&E Excavation, La Madera, NM
Final Cost: $2,338.88
EMNRD-MMD-2006-03
Clum Mine Maintenance Project
Runyan Construction Co., Silver City, NM
Final Cost: $2,483.18
EMNRD-MMD-2006-02
Granite Gap Mine Safeguard Project
St. Cloud Mining Company, Truth or Consequences, NM
Final Cost: $331,713.72
EMNRD-MMD-2006-01
Bayard-Niblett Mine Safeguard Project
E&E Excavation, La Madera, NM
Final Cost: $12,849.07
2005 Go back to the top
EMNRD-MMD-2005-04
Fluorite Ridge & Lordsburg II Emergency Maintenance Project
Runyan Construction, Silver City, NM
Final Cost: $3,337.03
EMNRD-MMD-2005-03
Lumberton Mine Reclamation Project
St. Cloud Mining Company, Truth or Consequences, NM
Final Cost: $145,884.73
EMNRD-MMD-2005-02
Sugarite Gob Reclamation Project - Phase V
Samcon Inc., Albuquerque, NM
Final Cost: $856,692.37
EMNRD-MMD-2005-01
La Madera Mine Safeguard Project
E&E Excavation, La Madera, NM
Final Cost: $55,398.44
2004 Go back to the top
EMNRD-MMD-2004-04
Gold Hill Mine Safeguard Project
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $188,528.08
EMNRD-MMD-2004-03
Lake Valley Mine Safeguard Project - Phase I
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $410,927.33
EMNRD-MMD-2004-02
BOG Canyon Mine Safeguard Project
Jack Johnson Excavating Inc., Alto, NM
Final Cost: $4,531.13
EMNRD-MMD-2004-01
Yankee-Vukonich Mine Reclamation Project
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $549,820.19
2003 Go back to the top
EMNRD-MMD-2003-04
Abbe Springs Safeguard Project
4 A's Contractors, Inc.
Final Cost: $2,380.43
EMNRD-MMD-2003-03
Sugarite Gob Reclamation Project - Phase IV
C&R Forestry Inc., Albuquerque, NM
Final Cost: $577,809.62
EMNRD-MMD-2003-02
Cerrillos South Mine Safeguard Project
Pioneer Industries Inc., Albuquerque, NM
Final Cost: $670,687.71
EMNRD-MMD-2003-01
Spar Group Mine Safeguard Project
J&H Services Inc., Albuquerque, NM
Final Cost: $90,210.98
2002 Go back to the top
EMNRD-MMD-2002-02
Real de Dolores Mine Safeguard Project
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $154,913.07
EMNRD-MMD-2002-01
Socorro West Maintenance Project
Smith Construction Company, Placitas, NM
Final Cost: $25,862.81
2001 Go back to the top
EMNRD-MMD-2001-01
Lordsburg-Gore Canyon Mine Safeguard Project
Runyan Construction Co., Silver City, NM
Final Cost: $148,616.16
EMNRD-MMD-2001-02
Sugarite Gob Reclamation Project - Phase III
C&R Forestry Inc. Albuquerque, NM
Final Cost: $666,350.54
EMNRD-MMD-2001-03
Orogrande Mine Safeguard Project - Phase I
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $293,736.36
2000 Go back to the top
EMNRD-MMD-2000-05
Fluorite Ridge Seeding Project
St. Cloud Mining Company, Truth or Consequences, NM
Final Cost: $22,350.27
EMNRD-MMD-2000-04
Black Copper Maintenance Project
Smith Construction Company, Albuquerque, NM
Final Cost: $2,271.90
EMNRD-MMD-2000-03
Carthage Gob Reclamation Project - Phase III
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $96,342.04
EMNRD-MMD-2000-02
Casamero Lake Coal Mine Reclamation Project
Runyan Construction Co., Silver City, NM
Final Cost: $20,031.72
EMNRD-MMD-2000-01
Sugarite Gob Reclamation Project - Phase II
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $441,338.01
1999 Go back to the top
EMNRD-MMD-1999-03
Gallup-Navajo Coal Mine Fire Project
EMNRD-MMD-1999-02
Cochiti Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $114,118.52
EMNRD-MMD-1999-01
Madrid Drainage Gob Reclamation Project
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $99,440.76
EMNRD-MMD-1999
Gallup-Heaton Fencing 1999
Gallup Fence & Construction
Final Cost: $1,328.91
1998 Go back to the top
Penasco Maintenance Project (Tungsten Mine)
Leandro Lopez, Penasco, NM
Final Cost: $372.09
EMNRD-MMD-1998-04
Carthage Gob Reclamation Project - Phase II
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $478,006.66
EMNRD-MMD-1998-03
Sugarite Gob Reclamation Project - Phase I
Lopez Excavation, Penasco, NM
Final Cost: $213,430.32
EMNRD-MMD-1998-02
Philmont Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $43,895.11
EMNRD-MMD-1998-01
Fluorite Ridge Mine Safeguard Project
Lopez Excavating, Penasco, NM
Final Cost: $142,140.14
EMNRD-MMD-1998
Heaton Maintenance '98
Polich Truckings
Final Cost: $5,097.00
1997 Go back to the top
EMNRD-MMD-1997-07
Derry I-25 Mine Safeguard Project
St. Cloud Mining Co., Truth or Consequences, NM
Final Cost: $30,245.04
EMNRD-MMD-1997-06
Rociada Mines Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $5,597.48
EMNRD-MMD-1997-05
Carthage Gob Reclamation Project - Phase I
Clifton Construction, McAlister, NM
Final Cost: $147,771.97
EMNRD-MMD-1997-04
Real de los Cerrillos Project
Lopez Excavating, Penasco, NM
Awarded Amount: $37,276.88
Final Cost: $38,097.55
EMNRD-MMD-1997-03
Organ 93 Mine Safeguard Project
Michael C. Donegan, Inc., Albuquerque, NM
Final Cost: $48,429.32
EMNRD-MMD-1997-02
Carlsbad Mining Prospects Reclamation Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $4,954.44
EMNRD-MMD-1997-01
Turquoise Hills Project
Smith Construction Company, Albuquerque, NM
Awarded Amount:$109,978.94
Final Cost: $115,578.39
1996 Go back to the top
EMNRD-MMD-1996-05
Gage Mine Maintenance Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $6,682.06
EMNRD-MMD-1996-04
La Ventana Coal Reclamation Project
Khani Company, Albuquerque, NM
Final Cost: $107,875.34
EMNRD-MMD-1996-03
La Plata Mines Maintenance Project
La Plata Construction Inc., La Plata, NM
Final Cost: $20,063.47
EMNRD-MMD-1996-02
Madrid Maintenance Project
Eker Brothers, Inc., Albuquerque, NM
Final Cost: $24,428.28
EMNRD-MMD-1996-01
Socorro West Mine Safeguard Project
Triple L Constructors, Dolores, CO
Final Cost: $109,163.54
1995 Go back to the top
EMNRD-MMD-1995-04
Water Canyon/San Vicente Mines Safeguard Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $63,262.63
EMNRD-MMD-1995-03
Clum and Foster Mine Maintenance Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $10,197.15
EMNRD-MMD-1995-02
La Petaca Mines Safeguard Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $25,184.63
EMNRD-MMD-1995-01
Boston Hill Mine Safeguard Project
Blair-Turner Construction, Silver City, NM
Final Cost: $73,013.41
1994 Go back to the top
Madrid Reclamation Maintenance Project
Lucero Construction, Santa Fe, NM
Final Cost: $450.00
Boston Hill Maintenance Project
Chava Trucking Company, Silver City, NM
Final Cost: $
EMNRD-MMD
Savage Mines Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $3,200.00
EMNRD-MMD-1994-11
Placitas Coal Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $3,918.00
EMNRD-MMD-1994-10
White Signal Mines Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $43,046.28
EMNRD-MMD-1994-09
White Oaks Coal Mines Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $22,644.98
EMNRD-MMD-1994-08
Bonito Lake Mines Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $104,152.60
EMNRD-MMD-1994-07
Morgan/La Plata Mines Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $34,433.75
EMNRD-MMD-1994-06
Hot Spot Mines Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $24,511.61
EMNRD-MMD-1994-05
Hopewell Mine Safeguard Project
Larry Mac Construction, Espanola, NM
Final Cost: $12,469.02
EMNRD-MMD-1994-04
Gage Mine Safeguard Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $307,327.85
EMNRD-MMD-1994-03
Bayard West Mines Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $10,450.69
EMNRD-MMD-1994-02
Madrid Mines Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $9,358.88
EMNRD-MMD-1994-01
Stephenson-Bennett Mine Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $95,076.48
1993 Go back to the top
EMNRD-MMD-1993
Riley/Whale Back Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $1,920.00
EMNRD-MMD-1993-06
Capitan/Coalora Mines Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $9,456.00
EMNRD-MMD-1993-05
Modoc Mine Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $58,806.56
EMNRD-MMD-1993-04
Wingate Mine Safeguard and Reclamation Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $29,446.67
EMNRD-MMD-1993-03
Sandia Mining District Mine Closure Project
Smith Construction Company, Albuquerque, NM
Final Cost: $53,916.22
EMNRD-MMD-1993-02
Sanchez and Wilkins Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $5,222.25
EMNRD-MMD-1993-01
Carthage Mine Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $68,963.77
1992 Go back to the top
EMNRD-MMD-1992-06
Rough Mountain Mine Safeguard Project
Chava Trucking Company, Albuquerque, NM
Final Cost: $96,055.25
EMNRD-MMD-1992-05
Grants Uranium Phase II Mine Safeguard Project
Khani Company, Albuquerque, NM
Final Cost: $133,810.50
EMNRD-MMD-1992-04
Lordsburg Mine Safeguard Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $18,842.11
EMNRD-MMD-1992-03
Tres Ritos Mine Safeguard Project
Paul's General Contracting, Vadito, NM
Final Cost: $1,115.63
EMNRD-MMD-1992-02
Foster Mine Safeguard Project
Smith Construction Company, Albuquerque, NM
Final Cost: $38,444.20
EMNRD-MMD-1992-01
Clum Mine Safeguard Project
Michael C. Donegan Inc., Albuquerque, NM
Final Cost: $102,934.25
1991 Go back to the top
Coyote/Hagen Mine Closure Project
Smith Construction Company, Albuquerque, NM
Final Cost: $4,193.50
EMNRD-MMD-1991-03
Black Copper Mine Safeguard Project
Khani Company, Albuquerque, NM
Final Cost: $8,393.75
EMNRD-MMD-1991-02
Penasco Mine Safeguard Project
Khani Company, Albuquerque, NM
Final Cost: $34,676.46
EMNRD-MMD-1991-01
Bayard Mine Safeguard Project
E.P.& L. Constructors, Deming, NM
Final Cost: $14,611.75
1990 Go back to the top
Boston Hill/Chloride Flats Maintenance Project
Falcon Enterprises, Silver City, NM
Final Cost: $1,749.00
Northside Street Maintenance Project
Hamilton Bros. Inc., Gallup, NM
Final Cost: $2,400.00
La Posada Mine Closure Project
Smith Construction Company, Albuquerque, NM
Final Cost: $3,683.00
EMNRD-MMD-1990-12
Jones/Tortugas Mine Backfilling Project
Jackson's Earth Moving, Elephant Butte, NM
Final Cost: $266,768.61
EMNRD-MMD-1990-10
Pecos Coal Mine Closure Project
Ring Brick Floors, Rio Rancho, NM
Final Cost: $1,949.44
EMNRD-MMD-1990-09
Vermejo Park Ranch-Koehler Erosion Control Project
Kirkland Construction Company, Rye, CO
Awarded Amount: $87,565.00
Total Cost: 87,565.00
EMNRD-MMD-1990-08
Amargo/Erler Mine Closure Project
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $18,650.30
EMNRD-MMD-1990-06
Cerrillos-Los Cerrillos Mine Closure Project
Lon Danley General Contractor, Mesilla Park, NM
Awarded Amount: $57,214.95
Final Cost: $66,021.43
EMNRD-MMD-1990-04
Grants Uranium Phase I Project
Romero Excavating & Trucking Inc., Gallup, NM
Final Cost: $108,912.93
EMNRD-MMD-1990-03
Van Houten Mine Waste Hauling Project
W.M. Serazio Company, Raton, NM
Final Cost: $76,422.03
EMNRD-MMD-1990-02
Catalpa Burning Gob Reclamation Project
Fuhs Trucking Equipment Rental, Gallup, NM
Final Cost: $23,186.31
EMNRD-MMD-1990-01
Oscura/Three Rivers Mine Closure Project
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $3,888.00
1989 Go back to the top
Weaver Maintenance Project
Fuhs Trucking Company, Gallup, NM
Final Cost: $356.90
EMNRD-MMD-1989-13
Van Houten Reclamation Project
Raton Public Schools, District II, Raton, NM
Final Cost: $4,999.00
EMNRD-MMD-1989-12
Organ Phase II Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $26,314.76
EMNRD-MMD-1989-10
Northside Mine Subsidence Abatement Project
W.G. Jaques Company, Des Moines, IA
Final Cost: $890,075.91
EMNRD-MMD-1989-09
Boston Hill Mine Closure Project
Smith Construction Company, Albuquerque, NM
Final Cost: $93,744.27
EMNRD-MMD-1989-08
Van Houten Mine Fire Fence Maintenance Project
Raton Public Schools, District II, Raton, NM
Final Cost: $4,800.00
EMNRD-MMD-1989-07
Sugarite (B) Mine Reclamation Project
Raton Public Schools, District II, Raton, NM
Final Cost: $96,316.00
EMNRD-MMD-1989-06
Gamerco Scale Pits Small Project
Worthen Builders Inc., Gallup, NM
Final Cost: $2,889.11
EMNRD-MMD-1989-05
Navajo Allotment Mine Closure Project
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $15,384.51
EMNRD-MMD-1989-04
Coal Mine Closure Project (Sandoval County)
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $54,272.22
EMNRD-MMD-1989-03
Hyde/Wingate Mine Closure Project
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $18,317.49
EMNRD-MMD-1989-02
Mirabal Mine Blasting Project
Lon Danley General Contractor, Mesilla Park, NM
Final Cost: $11,993.71
EMNRD-MMD-1989-01
O'Mara Mine Closure Project
H.N. Green Construction Company, Gallup, NM
Final Cost: $15,384.57
1988 Go back to the top
Madrid Maintenance (#40 Mines)
Red Rok (sic) Environmental Services, Santa Fe, NM
Final Cost: $2,086.42
EMNRD-MMD-1988-08
Gibson/Heaton Mine Closure Project
Farris Mines Inc., Grants, NM
Final Cost: $38,119.43
EMNRD-MMD-1988-06
Van Houten Mine Closure Project
H.N. Green Construction Company, Des Moines, NM
Final Cost: $237,425.32
EMNRD-MMD-1988-05
Coal Mine Closures & Reclamation Project (Colfax County)
Atwater Construction Company, Raton, NM
Final Cost: $44,805.71
EMNRD-MMD-1988-04
La Ventana Mine Closure Project
Farris Mines Inc., Grants, NM
Final Cost: $53,779.32
EMNRD-MMD-1988-03
Mentmore/Catalpa Mine Closure Project
Farris Mines Inc., Grants, NM
Final Cost: $44,375.47
EMNRD-MMD-1988-02
Tortugas Mine Closure Project
Earth & Sun Construction Inc., Las Cruces, NM
Final Cost: $62,294.87
EMNRD-MMD-1988-01
Northside Mine Subsidence Study
Alan K. Kuhn P.E., Albuquerque, NM
Final Cost: $165,747.00
1987 Go back to the top
EMNRD-MMD-1987-14
Vermejo Park Ranch-Koehler PCB Transformer Disposal Project
APTUS, Coffeyville, KS
Awarded Amount: $12.444.00
Final Cost:$13,684.00
EMNRD-MMD-1987-13
Koehler Mine Refuse Pile Regrading and Drainage Control Project
D. Bacon Construction, Raton, NM
Final Cost: $442,337.92
EMNRD-MMD-1987-12
Vermejo Park Ranch-Swastika '87 Project
Greg Carlisle Excavation, Cimarron, NM
Awarded Amount:$16,671.60
Final Cost: $18,052.48
EMNRD-MMD-1987-11
Talbot Mine Backfilling Project
H.N. Green Construction Company, Des Moines, NM
Final Cost: $29,172.64
EMNRD-MMD-1987-10
Van Houten Mine Fire Fencing Project
Valley Fence Company, Albuquerque, NM
Final Cost: $10,620.69
EMNRD-MMD-1987-07
Mine Adit and Shaft Closures Project at Chloride Flat
Versatile Construction Company, Logan, NM
Final Cost: $70,538.87
EMNRD-MMD-1987-06
Investigative Mine Drilling Project at Aztec Shopping Center and Mossman Subdivision
Eby Mine Services, Brighton, CO
Final Cost: $110,724.07
EMNRD-MMD-1987-05
Skull Shaft Mine Closure Project
Red Owl Marine and Construction Company, Santa Fe, NM
Final Cost: $6,012.77
EMNRD-MMD-1987-04
Mine Backfilling Project Under the Community of Allison
Eby Mine Services, Brighton, CO
Final Cost: $201,569.64
EMNRD-MMD-1987-03
Memphis Mine Shaft Closure Project
Smith Construction Company, Albuquerque, NM
Final Cost: $13,333.00
EMNRD-MMD-1987-02
Mine Adit, Shaft and Stope Closure Project (Diener Canyon)
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $233,640.31
EMNRD-MMD-1987-01
Highway 32 Mine Closure Project
Farris Mines Inc., Grants, NM
Final Cost: $66,606.07
1986 Go back to the top
EMNRD-MMD-1986-11
Chiaramonte Mine Reclamation at Gallup
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $25,664.81
EMNRD-MMD-1986-10
Installation of Culverts at Madrid
Central Concrete Products Inc., Santa Fe, NM
Final Cost: $16,979.07
EMNRD-MMD-1986-08
Backfilling under the Northside Community Center
CDK Contracting Company, Farmington, NM
Awarded Amount: $749,331.88
Final Cost: $763,645.01
EMNRD-MMD-1986-05
Monero Reclamation
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $200,637.52
EMNRD-MMD-1986-03
Weaver and Grenko Mine Closures and Reclamation around Gallup
Worthen Builders Inc., Gallup, NM
Final Cost: $53,739.90
EMNRD-MMD-1986-01
Adit Closure and Reclamation at Sugarite
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $47,512.50
1985 Go back to the top
Monero Trucking
Cordova Trucking, Lumberton, NM
Final Cost: $63,711.68
EMNRD-MMD-1985-14
Waterflow Exploratory Drilling and Hazard Abatement
Eichman Excavation Inc., Gallup, NM
Final Cost: $80,145.42
EMNRD-MMD-1985-13
Closure of Adits and Shafts Northwest of Madrid
Todilto Exploration and Development Corp., Albuquerque, NM
Final Cost: $245,719.75
EMNRD-MMD-1985-12
Closure of Adits and Shafts Southeast of Madrid
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $120,237.39
EMNRD-MMD-1985-11
Madrid Demolition and Concrete Closures
Red Owl Marine and Construction, Santa Fe, NM
Final Cost: $27,085.50
EMNRD-MMD-1985-10
Madrid Exploratory Drilling
Farris Mines Inc., Grants, NM
Final Cost: $3,962.50
EMNRD-MMD-1985-08
Allison Exploratory Drilling
Stewart Brothers Drilling Company, Grants, NM
Final Cost: $554,552.64
EMNRD-MMD-1985-07
Closure of Adits and Shafts at Monero-Lumberton
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $44,900.00
EMNRD-MMD-1985-06
Demolition and Stabilization of Abandoned Structures at Monero
Gilbert and Sons Construction, Santa Fe, NM
Final Cost: $107,800.50
EMNRD-MMD-1985-05
Chiaramonte Mine Closure and Drainage Control
Consolidated Constructors, Farmington, NM
Final Cost: $151,104.31
EMNRD-MMD-1985-04
Cathedral School Drilling Project
Badger Drilling, Albuquerque, NM
Final Cost: $84,591.00
EMNRD-MMD-1985-03
Madrid Water Tank Roof Mine Hazard Abatement Project
Red Owl Marine and Construction, Santa Fe, NM
Final Cost: $18,338.69
1984 Go back to the top
EMNRD-MMD-1984-01
Gamerco and Laguna Circle Mine Hazard Abatement
Eichman Excavation Inc., Gallup, NM
Final Cost: $260,094.74
Madrid Asbestos Removal Project
Keers Inc., Albuquerque, NM
1983 Go back to the top
EMNRD-MMD-1983-05
Laguna Circle Project
Farris Mines Inc., Grants, NM
Final Cost: $338,899.24
EMNRD-MMD-1983-04
Heaton Canyon/Sky City Exploratory Drilling Project
Stewart Brothers Drilling Company, Grants, NM
Final Cost: $60,308.00
EMNRD-MMD-1983-03
Caledonia, Otero and Catalpa-Southwestern Engineering and Construction Work
Eichman Excavation and Trenching Company, Gallup, NM
Final Cost: $15,662.78
1981 Go back to the top
Closure of Madrid Sites 40, 41, 81, 95 and 96
Eby Constructors, Kent, WA
Final Cost: $62,994.00
FAQ - AML
Program Overview
Construction Projects
Projects Under Development
Hazards of Abandoned Mines
Reported /Fatalities and Injuries
Award-winning Work in New Mexico
Wildlife in Abandoned Mines
NAAMLP Annual Scholarship
Educational Materials
RFPs and ITBs
Links