Socorro West Maintenance Project - Phase II

The Socorro West Maintenance Project - Phase II is located between nine and 17 miles west of Socorro in Socorro County, New Mexico. The project areas (see Figures 1, 2 and 3) are on public and private land in Section 12, Township 4 South, Range 2 West and Section 27, Township 3 South, Range 3 West.

The project involves the following work:

  • Backfilling two small shafts
  • Construction of large toroid tire plug closures at one subsidence and one stope opening with small toroid mats, geotextile mesh and geotextile cloth.
  • Construction of polyurethane foam plug closure, with PVC drainpipe, steel sleeve and grated cover, at one shaft.
  • Construction of horizontal bat compatible closure at one stope with corrugated steel pipe riser in a PUF plug and a concrete footing.
  • Installation of steel flat bar at four shafts, removal of graffiti at one of these shafts, in the Water Canyon area.
  • Temporary access trails will be decompacted, berms built and seeded as required.

The Contractor shall leave all project areas in as good or better condition than before disturbance.

You may link to the all Specifications and Maps below.

 
Specifications
Socorro West Phase II Project Socorro West DIV 1-2 Socorro West II DIV 3
Socorro West DIV 5 Socorro West DIV 13
   
Figures and maps
Figure #1 Figure #5 Figure #9
Figure #2 Figure #6 Figure #10
Figure #3 Figure #7
Figure #4 Figure #8
   
Images of the Project  
Feature 13.5 Subsidence -  Looking into the opening. Feature 13.5 Subsidence - Vertical View

Feature 13.5 Subsidence

Looking into the opening.

Feature 13.5 Subsidence

Vertical View

Feature 15 Subsidence - Opening alongside shaft with bat gate. Feature 15 Subsidence - Opening alongside shaft with bat gate.

Feature 15 Subsidence

Opening alongside shaft.

Feature 15 Subsidence

Opening alongside shaft with bat gate.

Feature 17 Stope - Looking south with cable net and rock debris. Feature 17 Stope - Looking north with cable net and rock debris.

Feature 17 Stope

Looking south with cable net and rock debris.

Feature 17 Stope

Looking north with cable net and rock debris.

Water Canyon AML 2 Horizontal Bat Gate Water Canyon AML 2A Horizontal Bat Gate
Water Canyon AML 2 Horizontal Bat Gate Water Canyon AML 2A Horizontal Bat Gate
Water Canyon AML 3 Horizontal Bat Gate Water Canyon AML 4 Horizontal Bat Gate with Grafitti
Water Canyon AML 3 Horizontal Bat Gate Water Canyon AML 4 Horizontal Bat Gate with Grafitti

 

Sealed bid opening:
NM STATE PURCHASING DIVISION
ITB No. 00-521-00-05114

Low Bidder's List

MANDATORY PRE-BID CONFERENCE
DATE: April 29, 2010

PRE-BID ATTENDANCE LIST

   

BID DOCUMENT - Please follow instructions below:
1. Please READ all information in project manual before submitting a bid.
2. Upon entering all your data into form do a "SAVE AS" and save into your computer if you wish to save document.
3. To print click on the FILE tab then arrow down to PRINT.
4. Sign form and mail to:
General Services Department
Purchasing Division
P.O. Box 6850
Santa Fe, NM 87502
(505) 827-0472

 

NOTE: Administrative questions and/or comments contact:Dina Vigil @ 505.476.3430 or e-mail
Technical questions and/or comments contact:James Smith @ 505.476.3422 or e-mail

 

Post-construction Information
Year Completed:
Cost: $

Project Engineer: John Kretzmann, P.E.
Project Manager