Madrid Stormwater Improvement Project



 Project Documents

Preliminary Design Documents

              Surface Drainage Alternative (preferred)
- June 2013

                            Area North of Bridge Street

                            Area South of Bridge Street

               Buried Pipe Alternative - June 2013

                            Area North of Bridge Street

                            Area South of Bridge Street

               Schematics and Photos of Proposed Practices - June 2013

                            Sheet 1

                            Sheet 2

 

Planning Documents

Useful Links

 

 

 

 

 

 

 

New Mexico Energy, Minerals and Natural Resources Department | Copyright
1220 South St. Francis Drive | Santa Fe, NM 87505
Webmaster   |   EMNRD Legal Disclaimer