| 03-2013 |
Roca Honda Reclamation Plan Revision 1
RHR Responses to Agency Comments
RHR Cover Letter
Reclamation Plan Revision 1 (23 Mb)
Post Mine Radiological Surveys |
| 10-2012 |
Roca Honda Mine Baseline Data Report REV1
RHR Responses to Agency Comments
RHR Cover Letter
Baseline Cover
Baseline Interior Cover
Baseline TOC Acronyms
Section 1: Introduction
Section 2: Climatology
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Groundwater
Section 10: Prior Mining
Section 11: Cultural Properties
Section 12: Land Use
Section 13: Radiological Survey |
| 10-2012 |
Agency Comments to 05-2012 Reclamation Plan
|
| 09-2012 |
Roca Honda Mine Operations Plan REV1
Cover Letter
RHR Mine Operations Plan - Rev 1 with Replacement Pages
Attachment 1: Selected Construction Drawings
Responses to Agency Comments
|
| 08-2012 |
Cover Letter
Assessment of Potential
Groundwater Level Changes
from Dewatering at the
Proposed Roca Honda Mine
Appendix A
Appendix B
Appendix C
Appendix D
Appendix E
Roca Honda Resources Responses
|
| 06-2012 |
Cover Letter
Biological Survey of Reuse Pipeline Route
|
| 05-2012 |
Roca Honda Reclamation Plan, Cover Letter, May 2012
Roca Honda Response to Agency Comments on Reclamation Plan
Roca Honda Reclamation Plan, Revision 1, with May 2012 replacement pages
|
| 03-2012 |
Assessment of Potential Groundwater Level Changes from Dewatering at the Proposed Roca Honda Mine |
| |
Cover Letter
Addendum: Assessment of Potential Groundwater Level Changes from Dewatering at the Proposed Roca Honda Mine
|
| |
Revised Report (dated March 8, 2012) |
| |
Sections 1, 2, and 3
Section 1: Introduction
Section 2: Hydrogeology
Section 3: Construction of the Numerical Model |
| |
Section 4, 5, 6, and 7
Section 4: Calibration of the Historical Numerical Model
Section 5: Roca Honda Mine Dewatering Impact Assessment
Section 6: Summary and Conclusions
Section 7: References |
| |
Appendix A: Boundary Conditions by Model Layer
Appendix B: Hydraulic Conductivity Zones by Model Layer
Appendix C: Transient Calibration Plots
Appendix D: Potential Changes in Groundwater Levels at Wells with Water Supply Uses |
| 01-2012 |
Mine Operations Plan, Revision 1 (75 Mb)
Mine Operations Plan, Attachment 1-Construction Drawings (90 Mb)
Cover Letter from Roca Honda Resources
Roca Honda Resources Response to Comments on Mine Operations Plan |
| 11-2011 |
Assessment of Potential Groundwater Level Changes from Dewatering at the Roca Honda Mine, McKinley County, New Mexico (Intera, November 2011) |
| |
Sections 1, 2 and 3 (7 Mb)
Section 1: Introduction
Section 2: Hydrogeology
Section 3: Construction of the Numerical Model |
| |
Sections 4, 5, 6 and 7 (4 Mb)
Section 4: Calibration of the Historical Numerical Model
Section 5: Roca Honda Mine Dewatering Impact Assessment
Section 6: Summary and Conclusions
Section 7: References |
| |
Appendix A: Boundary Conditions by Model Layer (1.5 Mb)
Appendix B: Hydraulic Conductivity Zones by Model Layer (3 Mb)
Appendix C: Transient Calibration Plots
Appendix D: Potential Changes in Groundwater Levels at Wells with Water Supply Uses |
| 08-2011 |
RHR Reponses to MMD Comments on Reclamation Plan |
| 08-2011 |
Reclamation Plan for Roca Honda Mine |
| 01-2011 |
Roca Honda Resources Response to Agency Review Comments |
| 01-2011 |
Roca Honda Baseline Data Report Revision 1
Cover
Interior Cover
Table of Contents and Acronyms
Section 1 Introduction
Section 2 Climatology
Section 3 Topography
Section 4 Vegetation
Section 5 Wildlife
Section 6 Topsoil
Section 7 Geology
Section 8 Surface Water
Section 9 Groundwater
Section 10 Prior Mining
Section 11 Cultural Properties
Section 12 Land Use
Section 13 Radiological Survey
|
| 01-2011 |
Roca Honda Mine Water Treatment Plant Plant 60% Design
Appendix A Drawings
Appendix B Construction Quotations
Appendix C Operating Costs
Appendix D Equipment Sizing
Appendix E Capital and Construction Costs
Appendix F Design Criteria and Procedures |
| 12-06-2010 |
Public Notice, U.S. Forest Service Open House, Roca Honda Mine |
| 11-24-2010 |
Mining and Minerals Division Review Comments and Request for Additional Information, Mine Operations Plan and Reclamation Plan |
| 09-23-2010 |
Agency Review Comments and Request for Additional Information, Revised Sampling and Analysis Plan |
| 09-03-2010 |
Agency Review Comments and Request for Additional Information, Baseline Data Report |
| 04-2010 |
Agency Comments to Roca Honda New Mine Permit Application
New Mexico Department of Game and Fish |
| 02-2010 |
Agency Comments to Roca Honda New Mine Permit Application
New Mexico Department of Cultural Affairs
New Mexico Environment Department
Office of the State Engineer |
| 12-15-2010 |
Mining and Minerals Division Request for Agency Review and Comment on the Roca Honda New Mine Permit Application |
| 12-02-2009 |
Roca Honda Resources Response to Permit Application Administratively Complete Determination |
| 11-25-2009 |
Mining and Minerals Division Roca Honda New Mine Permit Application Administratively Complete Determination |
| 11-20-2009 |
Permit Application, Phase II of a New Mine Application
Permit Application for a New Mine |
| |
Baseline Data Report |
| |
|
Section 0: Table of Contents
Section 1: Introduction
Section 2: Climatology & Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Prior Mining Operations
Section 11: Historic Places & Cultural Properties
Section 12: Present Historic Land Use |
| |
Mine Operations Plan |
| |
U.S. Forest Service Plan of Operation |
| |
Reclamation Plan |
| 12-2009 |
Agency Comments to Roca Honda Revised Sampling and Analysis Plan
U.S. Forest Service Consolidated Response |
| 11-2009 |
Agency Comments to Roca Honda Revised Sampling and Analysis Plan
New Mexico Department of Game and Fish
Office of the State Engineer |
| 11-20-2009 |
Sampling and Analysis Plan Revision, Phase I of New Mine Application
Sampling and Analysis Plan Application
Section 1: Introduction
Section 2: Meteorology and Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Radiological Survey
Section 11: Historical Places and Cultural Properties
Section 12: Present and Historic Land Use
Section 13: Prior Mining Operations
Plate 1: Regional Ground Water Wells
Plate 1: Supporting Table
Attachment 1: Field Quality Assurance Plan
Attachment 2: Access Agreement |
| 11-17-2009 |
Multicultural Alliance for a Safe Environment (MASE) Request for Public Hearing on the Roca Honda New Mine Permit Application |
| 10-16-2009 |
Roca Honda Resources Response to Sampling and Analysis Plan Agency Comments |
| 09-2009 |
Agency Comments to Roca Honda Sampling and Analysis Plan
New Mexico Environment Department |
| 07-15-2009 |
Agency Comments to Roca Honda Sampling and Analysis Plan
No. 1: Mining & Minerals Division 07-10-09
No. 2: Department of Cultural Affairs 05-26-09
No. 3: Department of Game & Fish 05-21-09
No. 4: New Mexico Environment Department 05-29-09
No. 5a: Office of State Engineer Cover 05-29-09
No. 5b: Office of State Engineer 05-29-09
No. 5c: Office of State Engineer 05-21-09
No. 6: State Forestry Division 05-26-09
No. 7: Compilation of Agency Review Comments |
| 05-09-2009 |
Sampling and Analysis Plan Revision, Phase I of New Mine Application
Section 3:Topography
Section 13:Prior Mining Operations |
| 04-24-2009 |
State Solicits Public Comment on Sampling and Analysis Plan for Proposed Roca Honda Uranium Mining Operation |
| 04-15-2009 |
Sampling and Analysis Plan, Phase I of New Mine Application
Transmittal Letter
Roca Honda Resources Certification
Sampling Plan Application
Section 1: Introduction
Section 2: Meteorology and Air Quality
Section 3: Topography
Section 4: Vegetation
Section 5: Wildlife
Section 6: Topsoil
Section 7: Geology
Section 8: Surface Water
Section 9: Ground Water
Section 10: Radiological Survey
Section 11: Historical Places and Cultural Properties
Section 12: Present and Historic Land Use
Plate 1: Regional Ground Water Wells
Field Quality Assurance Plan |
| 01-05-2009 |
Mining and Minerals Division Roca Honda New Mine Permit Sampling and Analysis Plan Application Administratively Incomplete Determination |