GR010RE Tyrone Mine - Regular, Existing Mining Operation - Revision 09-01 Updated Closure/Closeout Plan (CCP)

GR010RE Tyrone Mine
Tyrone Mining Inc.
Copper, Grant County


Mining and Minerals Division will accept written public comments related to the August 5th Public Meeting through Monday, August 31, 2020.

Comments on the Closure/Closeout Plan and Public Meeting can be emailed to: EMNRD.MMD2@state.nm.us

   
08-2020 Update on Collateral
08-2020 GRIP Comments
08-2020 Public Meeting Presentations
    MMD Presentation
    FMI Presentation
    GRIP Presentation
08-2020 Letter from GRIP Withdrawing Request for Public Hearing
07-2020 Notice for Virtual Public Meeting on August 5, 2020
06-2020 MMD Comments on Closure/Closeout Plan Update
04-2020 Tyrone Closure/Closeout Plan Update, Revised April 2020
    Cover Letter
    Text, Figures, Plates and Tables
    Appendix A - Reclamation Design Drawings
    Appendix B - Facility Characteristics Forms
    Appendix C - Earthwork Cost Estimate Report
      Earthwork Cost Estimate - Excel spreadsheets
    Appendix D - Basis of Cost Estimate for Water Management and Treatment
      Cost Estimate - Excel spreadsheets
    Appendix E - Characterization and Volumetrics
    Appendix F - Tyrone Stockpile Stability Analysis
01-2020 Joint Agency Response to NPV Calculations
01-2020 FMI Response to Comments
12-2019 MMD Comments on Cost Estimate
07-2019 Tyrone Closure/Closeout Plan Update, Revised July 2019, Revision 09-01
    Text, Figures, Plates and Tables
    Appendix A - Reclamation Design Drawings
    Appendix B - Facility Characteristics Forms
    Appendix C - Earthwork Cost Estimate Summary Report
      Cover letter, with Attachment 1A and 1B
      Earthwork Cost Estimate - Excel spreadsheets
      NPV - Excel spreadsheets
    Appendix D - Basis of Cost Estimate for Water Management and Treatment
      Cost Estimate - Excel spreadsheets 
    Appendix E - Characterization and Volumetrics of Cover Materials
    Appendix F - Tyrone Stockpile Stability Analysis
05-2019 Cost Estimate
04-2018 FMI Response to Comments on Updated CCP Revision 09-01
12-2017 Comments on CCP, Revision 09-01
12-2013 MMD letter granting Public Hearing, Revision 09-01
11-2013 Public Notice Documentation, Revision 09-01
10-2013 Request for Public Hearing, Revision 09-01
07-2013 Tyrone Closure/Closeout Plan Update, Revision 09-01
    Text
    Figures
    Plates
    Tables
    Appendix A
    Appendix B
    Appendix C
    Appendix D
09-2012 Reclamation Cost Estimate Update, Revision 09-01
04-2009 Permit Revision 09-01, Closeout Plan Update
Closeout Plan Revision Cover Letter
Closeout Plan Certification
Closure / Closeout Plan Update (dated 10-11-2007)
 

 

 

 

Cover Letter
Cover Page
Closeout Plan Update
Tables
Figures
Plate 1: Mine Units & Facilities
Plate 2: Tailing Area Characteristics & Facilities
Plate 3: East Mine Unit Characteristics & Facilities
Appendix A: Design Drawings
Appendix B: Facility Characteristics Form
Appendix C: Earthwork Cost Estimate
Appendix D: Water Management & Treatment Cost Estimate
Appendix E: Additional Studies
 

Abatement Plan and Addendum
Comprehensive Cover Performance Evaluation
3X Tailing Annual Summary
3X Tailing As-Built
No. 1 Stockpile Annual Summary
No. 1 Stockpile As-Built

 

 

Stability Analysis & Study
    Pit Perimeter
    1A and 1B Stockpiles
    1C and 7A Stockpiles
    2A, 2B and 3A Stockpiles
    4C Stockpile
Borrow Source Materials Investigation
    Preliminary Report & Addendum
Supplemental Materials Characterization Study
    Interim Report and Final Report
Seepage Investigation Report
    Interim Report and Final Report
    Supplemental Ground Water Study
    Work Plan for Ground Water Modeling
    No. 3 Tailing Pond Assessment Update
    Tailing Transport & Deposition Impacts
    Sludge Handling Plan & Cost Estimate
    Work Plan for Surface Impoundments Study
    Process Solution Elimination Study & Response to Comments
    Work Plan for Feasibility Study
Discharge Elimination
    Mine Dewatering
    Municipal Sewage Sludge
    Sanitary Effluent No. 2 Dam
    Seepage from No. 1X Dam
    Seepage from Little Rock Mine
    Affected Areas Study
    Wildlife Monitoring Plan

06-2008 FMI Responses to Issues on Updated CCP, Revision 09-01
04-2004 Permit Revision 01-01
New Mexico Energy, Minerals and Natural Resources Department | Copyright
1220 South St. Francis Drive | Santa Fe, NM 87505
Webmaster   |   EMNRD Legal Disclaimer